Battery storage construction supervision: local building supervision and construction monitoring for battery storage and grid

Technology
Speicher & Netz
Department
Turnkey
Technical construction services
Phase
Implementation
Subphase
Construction management

Battery storage construction supervision: our local building supervision supports your project independently and with technical expertise to commissioning.

Consistent construction management saves time and costs. We supervise your storage project precisely and represent your interests on site: from civil works preparation through cabling to commissioning of the storage system. This way your battery storage system is realised correctly and on schedule and within budget. We think ahead and take care of the flow on the construction site.

On the construction site of a battery storage system, many works interlock: foundations and cable trenches, the installation of storage cabinets or containers together with transformers, inverters and switching and protection equipment, plus access roads, fencing and grid connection. Local building supervision continuously compares execution with the planning and the requirements of the permit decision, records progress and deviations and tracks defects until they are remedied. Before construction starts, decisions, expert opinions and documents are checked for completeness, and the drawings of executing companies are checked and given a review note. During execution, site walks, meetings and interim acceptances accompany progress; at the end there is an acceptance record with defects, the method of remedy and dates. How often reports are made is usually set by the decision. It also assesses whether changes to the construction are exempt from permitting, minor or subject to permitting, and warns early if deviations in cost, schedule or quality threaten. File notes and interim reports form the basis for the final report.

Fire protection deserves particular attention. For stationary battery storage systems above 100 kWh, the draft of the Technical Guideline for Preventive Fire Protection TRVB 165 N (battery storage systems) contains minimum requirements, for example on installation distances, extinguishing water supply and fire alarm technology; whether and in which edition it is to be applied in the project is clarified on a project basis, as is its binding nature. Thermal radiation in the event of fire is determined in full-scale fire tests; the arrangement of the containers in the storage park follows from this, and it must be implemented in construction accordingly. The conditions of the decision are also very concrete: depending on the system concept and the decision, liquid-tight transformer bunds, level monitoring and infiltration swales may be required before commissioning, as may access and entry for the fire service. A second interface is the grid. Meters, instrument transformers and the communication link to the grid operator need installation locations with power supply and suitable ambient conditions, and the grid operator can issue technical conditions whose implementation on site is to be checked. The earlier such points appear in construction supervision, the less rework arises shortly before commissioning. In the event of a battery fire, the fire brigade determines the response and cooling measures on the basis of the situation, the system and the agreed emergency concept; this results in requirements for access, layout and extinguishing water, whose implementation becomes visible on site.

At EWS, all the threads come together. We check standards and safety requirements strictly, document in detail, track defects and, together with our biology department, identify risks early, for example in environmental construction supervision. We support you with acceptance, commissioning and handover, see technical acceptance. Construction site coordination complements the coordination of the trades; the system itself is delivered by turnkey assembly.

Your benefits with local building supervision
Sound expertise from extensive project experience with storage projects
Experts covering the full range of qualifications for safe construction management
Close coordination with our biology department to identify risks early
Strong network of qualified companies
Economic and technical optimisation of your storage project
Central coordination: at EWS, all the threads come together
Strict monitoring of compliance with standards and safety requirements
Detailed documentation and defect tracking
Competent support with acceptance, commissioning and handover