Wind measurement using mast, LiDAR or SoDAR

Technology
Wind
Department
Accredited Services
Measurements and surveys
Phase
Planning
Subphase
Pre-project planning

Measuring the site-specific wind potential and site-specific wind conditions is essential right from the pre-project planning stage.
Only timely, comprehensive and professional surveys guarantee you long-term yields and profitability. All of this requires a certain lead time, which is why an early start is recommended. 

Our accredited testing centre, the EWS Testing Center takes care of the entire process for you. The output is an accredited measurement report, which forms the basis for bankable yield reports and reliable site classifications and stability reports.

Benefits
30 years of experience in wind measurement & site assessment, nationally and internationally
Extensive experience in complex terrain
Reliable project planning and professional project support
Competent all-round support from measurement and RSD verification/calibration to the bankable expert report
Customised measurement concepts, tailored to your specific site conditions
Accredited measurements and measurement support in accordance with IEC 61400-50-1, IEC 61400-50-2, FGW TR 6, MEASNET
Precise results thanks to state-of-the-art and calibrated measuring sensors
Reliable power supplies for remote locations
Minimised measurement uncertainties thanks to accreditation - for maximum P75 and P90 values
Minimisation of project risks through early involvement of our biology team (bat surveys)