Annual electricity generation

4,267 MWh of electricity for 1,219 households

Status

2023: Start of regular operations

Cleverly combined to form a hybrid park utilising wind and solar energy

As an EPC contractor, EWS planned, supplied and implemented an agri-photovoltaic plant for Gugelsolar GmbH in the municipality of Gaweinstal in Lower Austria. The EWS Sonnenfeld® , together with four wind turbines – for which EWS also handled the construction management – is the first hybrid park of its kind to generate green electricity from wind and solar energy with maximum land-use efficiency.

Yield data for EWS Sonnenfeld Pellendorf

  • 3.2 ha for agricultural use (80 %)
  • 0.72 ha for enhancing biodiversity (flower strips, bee pastures, fallow land) (18 %)
  • 0.08 ha for solar power generation (2 %)
  • CO₂ savings over 30 years: 114,260 t

Yield data for the Gugelberg wind farm

  • 3 x Vestas V112, hub height 143 m, 3.3 MW each (2017)
  • 1 x Vestas V162, hub height 169 m, 6.2 MW (2023)

Annual electricity production at the hybrid park: 44,300 MWh
Energy for 14,700 households (domestic electricity)

Combining wind energy and agri-PV offers several advantages:

  • maximum increase in yields through triple use of the land
  • maximum utilisation of available grid capacity and connection points
  • cost savings through shared use / procurement of cable infrastructure and grid connections
  • Increased grid stability through the smoothing of annual electricity production
  • Maximum system compatibility for electricity grids and self-consumption systems
  • optimised operational management through a centralised PV and wind farm control system
  • rapid and cost-effective implementation with minimal land use