EWS Sonnenfeld Pellendorf (Lower Austria)

EWS Sonnenfeld Pellendorf als Hybridpark mit dem Windpark Gugelberg
Client

Gugelsolar GmbH

Energy system

Agri-PV

Installed power

3,6 MWp

System type

2P Tracker

Annual electricity production

4,267 MWh of electricity for 1,219 households

Status

Start of regular operations in 2023

Cleverly combined into a hybrid wind and solar energy park

Yield data EWS Sonnenfeld Pellendorf

  • 3.2 ha for agricultural use (80 %)
  • 0,72 ha to increase biodiversity (flower strips, bee pastures, fallow land) (18 %)
  • 0.08 ha for solar power production (2 %)

Yield data for Gugelberg wind farm

  • 3 x Vestas V112, hub height 143m, 3.3 MW each (2017)
  • 1 x Vestas V162, hub height 169m, 6.2 MW (2023)

Annual electricity production: 44.300 MWh
Energy for 14.700 households (household electricity)

The combination of wind energy and agri-PV has several advantages:

  • maximum increase in yields through triple utilisation of the area
  • maximum utilisation of the available grid capacities and integration stations
  • cost savings through joint use/procurement of the cable infrastructure and grid transmission
  • increased grid stability by stabilising annual electricity production
  • highest system compatibility for power grids and self-consumption systems
  • optimised operational management through higher-level PV and wind farm control
  • quick and cost-effective implementation with minimum land consumption