Client
oekostrom AG
Energy system
Agri-PV
installed capacity
7 MWp
System type
2P Tracker
Annual electricity generation
8.35 million kWh
Selectricity for around 2,390 households
Status
in operation since September 2025

The EWS construction team skilfully overcame the challenges posed by the complex terrain.

EWS supplied the turnkey agri-PV plant “EWS Sonnenfeld St. Vei im Innkreis” for oekostrom AG. As a regional partner, EWS was responsible for all key services relating to the approximately 7 MWp plant. The well-coordinated EWS team, comprising more than 100 highly qualified experts, works hand in hand across all departments and always maintains close communication with the individuals and institutions involved. In the Braunau district, more and more local authorities are taking responsibility for the future of energy and are increasingly opting for an EWS Sonnenfeld®. As product developers and a company based in Munderfinger, this naturally gives us particular pleasure.

Yield data for EWS Sonnenfeld St. Veit im Innkreis

  • 8.2 ha of agricultural land (80%)
  • 1.8 ha to enhance biodiversity (flower strips, bee pastures, fallow land) (18 per cent)
  • 0.2 ha for solar power generation (2 per cent)
  • CO₂ savings over 30 years: 194,443 tonnes

Special features

The complex terrain, featuring rows of hedgerows and undulating topography, presented many challenges, which our experienced team managed to overcome in an exemplary manner. Forward-thinking planning and a well-established interdisciplinary exchange of expertise helped us to adhere to the time and cost schedules in line with our client’s requirements.

Bauarbeiten im komplexen Gelände am EWS Sonnenfeld St. Veit im Innkreis
v.l.n.r.: DI Wolfgang Anzengruber (oekostrom AG), Ernst Steiner (EWS), Ehegattin von Herrn Anzengruber, Dr. Ulrich Streibl (oekostrom AG)
From left to right: DI Wolfgang Anzengruber (Chairman of the Supervisory Board of oekostrom AG), Ernst Steiner (EWS), Mr Anzengruber’s wife, Dr Ulrich Streibl (Spokesperson for the Executive Board of oekostrom AG)
EWS Sonnenfeld St. Veit im Innkreis
Erfahrung macht den Unterschied: Bauarbeiten im komplexen Gelände erfordern Know-how
Gute Planung und Abstimmung der Bereiche für ein gutes Gelingen
EWS Sonnenfeld St. Veit | Lageplan